Geotechnical Engineering Auckland
Our Projectsclearly focused on satisfying the needs of our clients.
Frimley Park Water Treatment Plant – Commissioning Works
Resource consents have recently been granted to undertake a substantial, high-quality, master planned residential development on a 1.4690ha site off 224 Great South Road.
Fisher & Paykel Appliances – New Worldwide Headquarters
Resource consents have recently been granted to undertake a substantial, high-quality, master planned residential development on a 1.4690ha site off 224 Great South Road.
Proposed Plan Change for Beachlands South
Resource consents have recently been granted to undertake a substantial, high-quality, master planned residential development on a 1.4690ha site off 224 Great South Road.
Land Development of Superlots at Hobsonville, Auckland
Resource consents have recently been granted to undertake a substantial, high-quality, master planned residential development on a 1.4690ha site off 224 Great South Road.
Water Safety Plan & Compliance Assessment, Beachlands, Auckland
Resource consents have recently been granted to undertake a substantial, high-quality, master planned residential development on a 1.4690ha site off 224 Great South Road.
Mixed-use Development, Grey Lynn, Auckland
Resource consents have recently been granted to undertake a substantial, high-quality, master planned residential development on a 1.4690ha site off 224 Great South Road.
Fast Tracked Resource Consents – Ōmāhu Apartment Development
Resource consents have recently been granted to undertake a substantial, high-quality, master planned residential development on a 1.4690ha site off 224 Great South Road.
Industrial Site, Environmental Due Diligence
GWE was engaged to provided environmental due diligence (EDD) services as part of a sales process for an industrial facility in the North Island. The purpose of the investigation was to determine what environmental liabilities may exist at the site.
Motairehe Marae, Wastewater Scheme
Motairehe Marae is located in Katherine Bay, on the north-western coast of Aotea (Great Barrier Island). The whare was opened in 1983.
St Michael’s Avenue Townhouses
GWE was commissioned to provide an infrastructure assessment report and prepare detailed engineering plans for EPA and building consent for the development.
KiwiRail, Environmental Compliance Management
As a trusted advisor to KiwiRail for many years, GWE has been engaged to provide multi-disciplinary environmental and engineering support services
Landfill Gas Mitigation Study, Remediation Plan
GWE was engaged to undertake a multi-disciplinary site investigation covering site contamination, geotechnical and landfill gas.
Bombay Motorway Services, Water Safety Plan
The Bombay Motorway Services supplies drinking water to all customers of the BP service station and adjoining hospitality offerings, which includes
Hokianga Kura, Wastewater Scheme
Te Kura Kaupapa Māori o Te Tonga o Hokianga, designed by Jasmax Architects, includes four separate buildings with interlinking paths and canopies
Formosa Country Club, Water Safety Plan
The Formosa Golf Club, located at Beachlands, south-east of Auckland, is an 18-hole championship golf course designed by national golf legend Sir Bob
Karekare Beach Residence, Sand Dune Stabilisation
A steep site (30-35°) on sand does not typically constitute a viable building site. The challenge was to determine a suitable foundation system
Taemaro Bay Residence, Rockfall Protection Works
A large beach-front residential development near the toe of a very steep and rocky cliff slope. Preliminary stability analysis results suggested
Kinloch Golf Club, Effluent Irrigation Scheme
The Envirowater/GWE design and construct team was awarded the contract to implement a treated effluent irrigation scheme at the Kinloch Public Golf
Karaka Sports Park, Infrastructure Design
The former Franklin District Council purchased 13 hectares of land adjacent to the existing sports complex with the intention of developing a large
Opua Boat Yard, Contaminated Site Remediation
GWE was engaged to undertake in-situ and ex-situ ground contamination remediation and geotechnical design for specifically engineered retaining walls.
Cliff Top Residence, Geotechnical Engineering
GWE was engaged to provide a staged geotechnical assessment of a residential redevelopment project within Auckland City. The site provided a complex
Pollen Street Offices, Retail and Hospitality
GWE were engaged to provide geotechnical investigation civil design and construction monitoring services for commercial development in central Ponsonby
Te Kia Ora Marae, Wastewater Scheme
GWE was commissioned to design a wastewater treatment and disposal scheme and prepare a discharge consent application to cover the proposed activities
Ahuriri Luxury Apartments, Offices and Hospitality
This mixed-use development comprises two medium rise buildings on a single allotment on the harbour edge. Building 1 has 4 levels over a basement car